APARTMENT ACCEPTANCE CHECKLIST
Acceptance is the only moment when the developer must fix defects for free. Print this checklist, bring a level, a tape measure, a flashlight and a phone charger to test sockets — and go point by point.
Documents
- Compare the actual apartment area with the contract
- Review the acceptance act before signing — do not sign until the inspection is finished
- Record water and electricity meter readings
Entrance door and windows
- The door opens and closes effortlessly, locks work
- No scratches or dents on the door leaf and frame
- Glazing without cracks, chips or scratches
- Windows open in all modes, hardware does not jam
- No draft along the frame perimeter (test with a lighter or sheet of paper)
Walls, floor, ceiling
- Check walls with a level — deviation no more than 5 mm per 2 meters
- No cracks in the floor screed or walls
- Screed without voids — tap the floor in several places
- Corners are square (check with a set square) — critical for furniture and the kitchen
- Ceiling height matches the contract — measure at several points
Electrics
- All sockets work (test with a phone charger)
- Switches and light fittings work
- Breakers in the panel are labeled and trip properly
- Doorbell and intercom work
Plumbing and ventilation
- No leaks on risers and connections
- Shut-off valves open and close
- Sewage outlets are not clogged
- Ventilation draft works (a sheet of paper sticks to the grille)
- Towel rail is fixed and does not leak
Heating
- Radiators are mounted level, no leaks
- Thermostats rotate
- The number of sections matches the project
Record every defect in the defect act — the developer must fix them for free. And if you plan a renovation with a design project, invite us for measurement right after acceptance: we will account for the real geometry before work begins.